• Contents
  • Index
  • Search
  • Welcome
  • Introduction
  • Getting Started
    • Lesson 1 - Getting started
    • Lesson 2 - Add and Edit commands
    • Lesson 3 - Add, Copy and Break commands
    • Lesson 4 : Fittings, valves and pipes
    • Lesson 5 : Calculating the system
    • Lesson 6 – Adding Loops in FHC
  • Reference for FHC
    • Project Data
      • FHC Project Data
      • Water Supply
      • Design Area
      • Head Codes
      • Nodes / Pipes
    • File Menu
    • Edit menu
      • Edit Menu
      • Edit pipe command
      • Undo command
      • Global changes on all or seleted pipes
        • Global changes - Node Numbers
        • Global changes - Size / types
        • Global changes - Lengths / Slopes
        • Global changes - Heads / Areas
    • Draw menu
      • Draw menu
      • Add Pipe command
        • Add Pipe Command
          • Head at end node
          • Optional items
          • Upstream pipe
          • Copy another
      • Break Pipe
      • Delete Pipe
      • Copy - By Selection
      • Rotate
      • Resequence all Nodes
    • Calculate
      • FHC Calculation and options
      • Calculate Menu
      • Calculate – Options
      • Calculation Summary
      • Optimise Pipe Sizes
      • Auto Pipe Sizing
        • Auto pipe sizing
        • Auto Pipe Size - Calculate Menu options
    • Reports
      • Reports menu
    • Tools menu
      • Interactive Edit
      • Preferences
        • Options
        • Display
      • Utilities
      • FHC Test verification module
    • View menu
    • Help menu
  • Technical data sheets
    • Technical data sheets
    • TDS 1: Water mist calculations and FHC
    • TDS 4: How to add a water supply curve to a FHC project
    • TDS 5: Rapidrop flexible connections
    • TDS 6 : Risers, hydrants and water cannon
    • TDS 7 : Interpreting the FHC report
    • TDS 15: Pipes, fittings and valves
  • Appendix
    • Appendix A - Shortcut Keys
    • Appendix B - Formules
      • Hazen-Williams formula
      • K-Factor formula
      • Velocity in pipe
  • Add Pipe Command
    • Add : Pipe : Head at end Node
    • Add Pipe : Copy another
    • Add Pipe : Optional items
    • Add Pipe : Upstream items
  • Auto Node
  • Auto pipe size
  • Break pipe
  • Break pipe command
  • Calculate menu
    • Auto pipe sizing
    • Calculate – Options
    • Calculate Menu
    • Calculation Summary
    • Optimise Pipe Sizes
  • C-factor
  • Copy & Rotate command
  • Copy Command
  • Copy pipe
  • Darcy Weisbach
  • Delete pipe
  • design density
  • Draw Menu
  • DRY
  • Edit menu
    • Edit pipe
    • Global changes
    • Project data
    • Undo commnad
  • Edit Pipe Command
  • FHC project
  • File menu
  • Global changes
    • Global changes - Lengths / Slopes
    • Global changes - Node numbers
    • Global changes – Size / types
    • Globe changes Heads / Areas
  • Hayes-Williams
  • Head Codes
  • K-Factor formula
  • Node Numbers
  • Open FHC project
  • PDT
  • Pipe Properties
  • Project Data
    • Design area
    • Head codes
    • Node / Pipe Tab
    • Water Supply
  • Renumber Nodes
  • Resequencing Nodes
  • Rotate pipe
  • Save As
  • Shortcut Keys
  • Status Bar
  • Undo
  • Velocity in a pipe
  • View Command
  • Water mist
Match: